As viewed within the figure below, steady auger is utilized to drill the borehole, carry up drilled soil, and pour concrete even though the auger is moved up. Due to this fact, the borehole doesn't will need casing or hydrostatic tension to forestall harm to the borehole wall. The use https://cast-in-situ-piles46532.prublogger.com/31826388/5-simple-statements-about-cast-in-situ-piles-in-dhaka-explained