The primary park features a capability of two hundred MW whilst Sandrini II includes a ability of one hundred MW. The full expense of equally projects weren't disclosed having said that, all through construction, about two hundred personnel were employed. The jobs are expected to see A few positions opening https://solarcompanyinbakersfield.blogspot.com/2024/07/how-to-trace-best-commercial-solar.html