The surplus wire gives you sufficient slack to wire the new fixtures. If an attic is previously mentioned the ceiling, run the wire with the attic. If a concluded space is higher than the ceiling, use a long flexible drill little bit to drill with the joists and fish the https://saddamr256rtt0.theideasblog.com/profile